Repaired Causeway Provides Easier and Safer Access to Breakwater

IMG_4550A newly-resurfaced, rock lined gravel path now provides secure and even footing from the mainland to the breakwater.

Two large culverts have replaced the damaged and displaced footbridge near the breakwater.

During very hight tides, as occurred in late morning on September 2nd, most of
the causeway is inundated with 12 or more inches of water covering the low-lying area over the culvert nearest the mainland.

FoSG blog post (9-2-19) 4Therefore, caution must still be exercised, especially when crossing with small
children. Check the tide chart and plan accordingly.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s