Narragansett Dock Works staged equipment and materials for repair and surfacing of the causeway at Salter Grove that leads out to the breakwater on Wednesday, August 14th. Vehicles should not enter this section of the roadway.
Boulders were pried loose by an excavator to level the pathway.
Surface boulders have been pushed to the side and green sediment barriers are staked out in preparation for laying a new gravel path.