On February 14th, the City of Warwick posted a Request for Proposals (RFP) to repair the causeway connecting Salter Grove to the breakwater.
The proposal’s scope of work includes the design, permitting, and construction of improvements to the causeway to improve access to the breakwater. At a minimum, the areas currently containing culverts and a displaced footbridge superstructure, which are flooded at high tide, are to be repaired.