RFP for Causeway Repair Posted!

This slideshow requires JavaScript.

On February 14th, the City of Warwick posted a Request for Proposals (RFP) to repair the causeway connecting Salter Grove to the breakwater.

The proposal’s scope of work includes the design, permitting, and construction of improvements to the causeway to improve access to the breakwater. At a minimum, the areas currently containing culverts and a displaced footbridge superstructure, which are flooded at high tide, are to be repaired.

Continue reading

Phase I Fundraising Goal Exceeded!

We closed last year with nearly $8,000 raised to replace the playground equipment at Salter Grove—one third more than our goal. Thank you all for your generous support!

We raised $2,281 from the sale of raffle tickets and netted $4,572.50 from individual donations, We also received a $1,000 legislative grant via Sen. Michael McCaffrey. Some of these funds passed though our fiscal sponsor, the New England Grassroots Environment Fund.

Continue reading