On February 14th, the City of Warwick posted a Request for Proposals (RFP) to repair the causeway connecting Salter Grove to the breakwater.
The proposal’s scope of work includes the design, permitting, and construction of improvements to the causeway to improve access to the breakwater. At a minimum, the areas currently containing culverts and a displaced footbridge superstructure, which are flooded at high tide, are to be repaired.
We closed last year with nearly $8,000 raised to replace the playground equipment at Salter Grove—one third more than our goal. 

A number of new families from the neighborhood came to enjoy our autumn potluck on September 23rd. It felt more like summer with sunshine and blue skies. Light breezes had just enough strength to propel long sinuous bubbles that drifted for yards across the lawn. The youngest bubble maker was only three-years old! New and tasty dishes appeared for the potluck with the return of a crowd-pleasing favorite from before–lemon curd squares. A duo of up-and-coming face painters wowed the two community police officers in attendance as well as others with their artistic creations. A doe and her fawn made a special appearance as they came for their evening stroll in the park.